| Tying
Method |
Tube
Hangar Attachment |
Step 1
Overlap the edges of the tube until tab holes are side by
side. Insert tie material through tie holes and secure
with a double knot. This will form the bottom of the
tube. |
Step
1
Overlap edges until tab holes align. Insert long end of
tube hangar through the tab holes, from the inside and out
down the outside of the tube. |
Step 2
Repeat Step 1 to form the top of the tube. Only place one
knot on this end leaving enough tie material to secure
this end to the stake.
Step 3
Carefully position clipper over the vine so that the
bottom is resting firmly on the soil. Attach clipper to
the stake using loose ends of the upper tie, and mound
soil around the base of the tube.
|
Step
2
Align the bottom tabs and push the hangar rod through the
inside until it extends 6 to 8 inches.

|
|
|
Step
3
Position the hangar rod approx. 1.5 inches from the vine.
Push the rod into the soil until the angle on the rod top
is resting on the trellis wire.
Step 4
Carefully slide clipper Grow Tube down the rod until
the bottom is resting on the soil.
|
|
|
Step
5
Secure tube hangar to the trellis wire.

|
|
|
Important:
Mound soil around the base of the tube to a height
sufficient to seal the base |